Choose your region and language

Global
Argentina
Australia
Austria
Bahrain
Brazil
Bulgaria
Canada
Chile
China
Colombia
Czech Republik
Denmark
Egypt and North Africa
Finland
France
Germany
Greece
Hungary
India
Indonesia
Iraq
Ireland
Italy
Japan
Jordan
Kuwait
Malaysia
Mexico
New Zealand
Norway
Oman
Pakistan
Panama
Peru
Philippines
Poland
Portugal
Qatar
Saudi Arabia
Singapore
Slovakia
South Africa
South Korea
Spain
Sweden
Switzerland
Taiwan, China
Thailand
Türkiye
Ukraine
United Arab Emirates
United Kingdom
United States
Vietnam
English
Spanish
English
German
English
Portuguese
English
English
French
Spanish
Chinese
Spanish
English
English
English
English
French
German
English
English
English
English
English
English
Italian
Japanese
English
English
English
Spanish
English
English
English
English
Spanish
Spanish
English
Polish
English
English
English
English
English
English
English
Spanish
Swedish
German
French
Italian
English
English
English
English
English
English
English
English
Go

Menu

Customer Story

Network rail

Increasing the availability of rail infrastructure to enable greater passenger capacity and safer track maintenance with Ellipse EAM

The client

Network Rail owns, operates and develops Britain’s railway infrastructure, which includes 20,000 miles of track, 30,000 bridges, tunnels and viaducts, and thousands of signals, level crossings and stations. Network Rail also manages 20 of the United Kingdom’s largest stations.

The challenge

Driven by safety, performance and cost control, Network Rail set out to reduce potential risks to its employees and limit the number of planned and unplanned maintenance operations by increasing efficiency in the planning and resolution of track geometry faults.

Program objectives included:

  • Record all identified defects and faults
  • Ensure defects are actioned when required
  • Be able to track the status of and defect and associated remedial work
  • Be able to review all defects/faults and work associated with an asset or location
  • Facilitate the analysis of trends and effectiveness of remedial work, costs and asset management strategy

The solution

The TIGER (Track Integrated Geometry Engineers’ Reports) project was born, to replace paper-based records with Ellipse EAM. The basic process put in place is straightforward: Track geometry data (geometry faults and alerts, dip defects and super reds, very-poor and poor track quality) is gathered and loaded into a centralized system; this data is shared with Ellipse, which simplifies the process of raising work orders.

City Metro Rail,motion blur
City Metro Rail,motion blur

“The TIGER project is one of our first to remove a legacy process and is is being enthusiastically adopted by the routes.... Ultimately, it will improve stakeholder and passenger experience.”

– Nick Connelly, Head of Maintenance Systems, Network Rail
Overview
Location United Kingdom
Industry Rail
Solutions used